Estimating help for electrical contractors, nationwide Sample run: $1,500 mike@rodgersintelligence.com
Electrical Bid Desk
A crew in hard hats and hi-vis vests walking past white service trucks toward a concrete data center building at sunrise

Electrical Bid Desk / Data center electrical estimating

Data Center Electrical Estimating: Why the Backlog Hits Hardest Here

Data center invitations put the electrical package at the center of the bid, and they arrive while your estimators are already booked. These are the numbers behind that squeeze, each with its source.

Data center electrical estimating

The numbers behind the squeeze

  • Electrical distribution is 32 to 38 percent of GMP on 2026 data center bids (Archdesk, 2026-04-16).
  • Medium voltage switchgear runs about 22 months on 2026 orders (Archdesk, 2026-04-16), so gear lead time belongs in the bid/no-bid call.
  • 15.9 GW of data center capacity is under construction in the United States (BloombergNEF, 2026-03-24).
  • US data center construction spending rose 46 percent year over year in Q2 2026 (PitchBook Q2 2026 Construction and Engineering report, 2026-08-28).
  • 58 percent of firms say data center projects raised competition for skilled workers, and 49 percent report wage pressure (AGC and NCCER 2026 survey, reported by Colorado Biz, 2026-09-03).

What it does not do. It does not replace the engineer of record or stamp anything. It prepares your estimator's work; licensed decisions stay with licensed people.

$7,500 setup, then $1,500 a month.

Sample run on one bid you already sent: $1,500. The sample run output is yours to keep and stands on its own. If you start setup within 30 days, the sample run price comes off setup in full.

Request a sample run

See what a sample run returns